Middle East's longest outdoor LED screen debuts at Dubai Fountain

A stunning visual display now graces Dubai. The 418-meter curved LED screen operates at The Dubai Fountain during its renovation period. Blue Rhine Industries completed the massive 1,250sqm installation in under 60 days. Over 130 specially designed cabinets ensure the experience withstands Dubai's extreme climate.
Europe dome news CMW
Europe dome news CMW

Middle East | Guest Author
20 June 2025, 12:50pm 

The Middle East’s longest digital screen is now operational at the base of The Dubai Fountain, creating a visual experience during the landmark’s renovation period.

The 418 x 3 meter curved LED display was installed by Blue Rhine Industries for Emaar in under 60 days, minimising disruption at Dubai Mall while fountain renovations continue from May to October 2024.

Key Features:

  • 1,250sqm of curved LED display
  • Over 130 cabinets of INFiLED LED panels designed for architectural curves
  • Climate-controlled systems for Dubai’s extreme weather
  • Modular, reusable components supporting sustainability goals

“This project stands as a significant milestone for its scale and unprecedented speed of execution,” said John Joseph, director at Blue Rhine Industries. “Delivering a solution of this magnitude in under two months required exceptional dedication and expertise.”

“Dubai simply cannot tolerate any dimming of its vibrancy, especially at such a pivotal landmark,” added Samer Otaibi, Vice President of Sales at INFiLED MENA. “The objective was about curating a new, compelling experience for visitors.”

Comments

Comments are closed on this post.